Control Chart

Explore the fascinating world of Engineering Mathematics through the lens of the Control Chart. This comprehensive guide unlocks the meaning, properties, and practical applications of this important tool in process management. Understand how control charts are leveraged for process location, variation, and quality measures, even diving deep into the mathematical formulae behind them. With case studies and real-life examples, you'll grasp the pivotal role of Control Charts in engineering. Delve into this engaging exploration and gain a solid understanding of Control Chart usage in engineering mathematics.

Get started

Millions of flashcards designed to help you ace your studies

Sign up for free

Need help?
Meet our AI Assistant

Upload Icon

Create flashcards automatically from your own documents.

   Upload Documents
Upload Dots

FC Phone Screen

Need help with
Control Chart?
Ask our AI Assistant

Review generated flashcards

Sign up for free
You have reached the daily AI limit

Start learning or create your own AI flashcards

StudySmarter Editorial Team

Team Control Chart Teachers

  • 18 minutes reading time
  • Checked by StudySmarter Editorial Team
Save Article Save Article
Contents
Contents

Jump to a key chapter

    Understanding the Control Chart in Engineering Mathematics

    The control chart is a vital instrument in engineering mathematics aimed at managing process variability. Analysing this variability helps to make informed decisions about the factors that influence the output of an engineering process.

    Control Chart Meaning and Its Essential Properties

    A control chart, also known as a Shewhart chart or process-behaviour chart, is a graphical tool used in quality control processes to determine if a manufacturing or business process is in a state of statistical control.

    For illustration, imagine a car manufacturing plant, where the diameters of a specific engine component (say a valve) are measured. If each valve deviates from a standard size, this could lead to unwanted process variation and affect the functioning of the car. By applying control chart analysis, these variations can be monitored, and steps can be taken to minimize their occurrence. Hence, avoiding rework and additional costs.

    Deep Diving into Control Chart Meaning

    To further dissect the concept, control charts work on statistical principles. They are a perfect blend of time-series plotting with statistical limits. A control chart typically has three components:

    • Center Line (CL): Generally representing the average or median of the data you’re charting.
    • Upper Control Limit (UCL): This line, calculated from the data, represents the highest point that you'd expect a data point to reach assuming common cause variation.
    • Lower Control Limit (LCL): Similar to the UCL, the LCL represents the lowest expected point of common cause variation.

    When deployed in process monitoring, the control chart visualizes how the process alters with time. Data points outside the control limits indicate “out-of-control” and are evidence of the existence of special causes. The main goal of a control chart is to distinguish common cause variation from special cause variation. Achieving this goal greatly enhances process consistency.

    Key Control Chart Properties

    Control charts have specific inherent properties that are vital for their correct operation. These properties include Stability, Predictability, and Rule of Seven. Here they are defined and explained:

    Stability: This property reveals if the points of data are consistent over time. If the data points are scattered without a discernible pattern, then the process is described as stable.

    Predictability: If a process is stable (i.e., points are within control limits and exhibit a random pattern), then future performance can be predicted within certain limits.

    Rule of Seven In a control chart, seven or more points in a row on one side of the central line, or seven or more points trending up or down, can signify a process is out of control.

    For instance, consider a headphone manufacturing process. Using a control chart, if seven consecutive data points are recorded on one side of the average line (central line), this may indicate a potential drift in the process – perhaps a machinery calibration issue – which may need immediate attention to prevent defective pieces being manufactured.

    Practical Applications of the Control Chart

    Control charts play a pivotal role in identifying and monitoring process variability, improving the process output's predictability and reliability. They are prominently used across various sectors, including but not limited to, manufacturing, engineering, IT, healthcare, and logistics, revealing their broad spectrum of applications.

    Analyzing Control Chart Applications in Engineering Mathematics

    Engineering mathematics is predominantly concerned with developing mathematical methods and applying them directly to solve engineering problems. In this realm, control charts are implemented as powerful tools to monitor and control the variability of an engineering process.

    • In Production Engineering, control charts aid in maintaining the quality of the products by monitoring the deviations of the critical variables from their desired values. For instance, in the production of a car engine where each component's precision is crucial, a control chart helps maintain consistency and reduce defects.
    • In Software Engineering, control charts find their place in monitoring software development processes such as number of bugs detected over time or response time of a software system so that any deviations can be corrected promptly.
    • Chemical Engineering another important area where control charts are implemented is in monitoring chemical concentrations in a reaction process to check its stability and capability.
    • Control charts also have significant applications in Civil Engineering especially in quality control of constructing roads, bridges, and buildings.

    To create a control chart, first determine the average or mean of the data set. Let's denote this as:

    \[ \mu = \frac{1}{n} \sum_{i=1}^n x_i \]

    Next, calculate standard deviation (\(\sigma\)) for the set values. For this, you can use the formula:

    \[ \sigma = \sqrt{\frac{1}{n} \sum_{i=1}^n (x_i - \mu)^2} \]

    Many statistical software applications can generate control charts. Below is a sample python code to create a control chart:

    import numpy as np
    import matplotlib.pyplot as plt
    from matplotlib import style
    style.use('ggplot')
    
    data = np.random.normal(0.01, 0.02, 100)
    cumulative_data = np.cumsum(data)
    
    plt.plot(cumulative_data, linewidth=1.5)
    plt.plot([0, len(cumulative_data)], [np.mean(cumulative_data), np.mean(cumulative_data)], color='r', label='Mean')
    plt.fill_between(range(len(cumulative_data)), [np.mean(cumulative_data) + np.std(cumulative_data)] * len(cumulative_data), 
                    [np.mean(cumulative_data) - np.std(cumulative_data)] * len(cumulative_data), color = 'b', alpha = 0.15, label='1 std deviation')
    plt.legend(loc='upper left')
    plt.show()
    

    Case Study Examples of Control Chart Applications

    Case studies can best exemplify the practical application of control charts in engineering.

    Case Study 1: A famous car manufacturing company was facing issues with the variability in the dimensions of a critical part. To address this, they implemented a control chart to monitor the sizes of these components. By doing this, they were able to promptly detect special cause variations and found out that the main issue was coming from one particular machine. After necessary adjustments, they saw a substantial reduction in defective parts and hence, a significant increase in profits.

    Case Study 2: In the field of civil engineering, a construction company used control charts to maintain the strength of concrete mix, ensuring that structures built maintain their structural integrity. By monitoring samples of concrete with control charts, they could quickly identify deviations from the standard concrete mix and make real-time corrections. This led to higher quality structures and reduced costs related to rebuilding or repairing.

    These scenarios illustrate the power of control charts to maintain quality and reduce costs, affirming their importance in engineering mathematics.

    The Core Aspects of Control Charts in Process Management

    In process management, control charts are a valuable statistical tool. They help identify whether a process is in a state of statistical control and pinpoint sudden shifts in process performance. In essence, control charts are used to monitor the quality of products or services. There are two main categories of control charts: charts for process location and charts for process variation. Each serves a specific purpose in process management, and understanding these can result in substantial operational improvements.

    Control Charts for Process Location: A Thorough Examination

    The primary purpose of control charts for process location is to detect shifts in the process level. In other words, they are more focused on evaluating the central tendency of a process. These charts are effective in capturing sudden, significant changes in the process mean using the center line and control limits. The central line represents the average, while the control limits are derived from the process data.

    The most commonly used control chart for process location is the X-bar Chart, where "X-bar" signifies the average. These charts are used when data can be collected in subgroups, and the mean of each subgroup is computed and plotted on the chart. This chart can identify changes in the process average quickly, helping to reveal any causes of special-cause variation.

    This control chart (the X-bar chart) makes use of the following formulas. The process average is expressed as:

    \[ \mu = \frac{1}{n}\sum_{i=1}^{n} x_i \]

    Where \( \mu \) represents the average, \( n \) is the number of data points, and \( x_i \) represents each individual data point.

    The control limits of this chart are calculated using the standard deviation (\( \sigma \)) and the average of the sample ranges (R-bar) with the formulas:

    \[ UCL = \mu + A_2 \times \bar{R} \] \[ LCL = \mu - A_2 \times \bar{R} \]

    Where \( UCL \) and \( LCL \) are the upper and lower control limits, \( A_2 \) is a constant based on sample size, and \( \bar{R} \) is the average range.

    Practical Control Charts for Process Location Examples

    A bottle filling company can use an X-bar control chart to monitor their beer filling process. If all the measurements are within the control limits and follow a random pattern, it indicates that the beer filling process is steady and predictable. Any major deviations detected by the control chart would flag a need to investigate potential causes, such as incorrect adjustment of the filling equipment or inconsistent pressure. The company can then take corrective action early enough to prevent large volumes of either underfilled or overfilled beer bottles.

    Understanding Control Charts for Process Variation

    While control charts for process location focus on shifts in the process mean, control charts for process variation are designed to detect changes in the process variability or dispersion. The most common type of control chart used for process variation is the Range (R) Chart. Like the X-bar chart, the R-chart is most effective when the data can be grouped into subgroups. The range (R) of each subgroup is used to construct this control chart.

    The formulas used in creating an R chart includes the average range (\( \bar{R} \)):

    \[ \bar{R} = \frac{1}{n}\sum_{i=1}^{n} R_i \]

    And the control limits (the Upper Control Limit or UCL, and the Lower Control Limit or LCL) which are calculated with:

    \[ UCL = D_4 \times \bar{R} \] \[ LCL = D_3 \times \bar{R} \]

    Where \( D_3 \) and \( D_4 \) are constants based on the subgroup sample size.

    Detailed Study on Control Charts for Process Variation

    Let’s delve into a practical example. Imagine a food processing company making potato chips. It is crucial for the company to maintain consistent chip thickness to ensure equal cooking times and consistent taste. The manufacturing team uses a Range Chart to monitor the variation in chip thickness. When the Range Chart flags an out-of-control signal, indicating increased variation, the team knows to investigate for causes such as wear on the slicing machine blades. This allows them to take corrective action promptly, ensuring a consistently high-quality product.

    The Use of Control Charts for Attributes

    The field of quality control extends well beyond just measurements, often requiring the evaluation of qualitative attributes such as pass/fail, go/no go, or defective/non-defective. In such instances, Control Charts for Attributes come into play. They provide a statistical approach to monitor the characteristics of a process, helping practitioners make informed decisions.

    An In-Depth Study on Control Charts for Attributes

    Control charts for attributes are used to analyse discrete, counted data. For instance, they deal with the number of defects or nonconformities in a process or a number of nonconforming units. Two primary types of attribute control charts are:

    • p-Chart: Monitors the proportion or rate of defective items in a set
    • np-Chart: Monitors the number of defective items in a group

    In a p-Chart, the computation of control limits requires the proportion defective (\(p\)) and sample size (\(n\)). The control limits can be determined by:

    \[ UCL = p + 3 \sqrt{\frac{p(1-p)}{n}} \] \[ LCL = p - 3 \sqrt{\frac{p(1-p)}{n}} \]

    Where \(UCL\) and \(LCL\) represent the upper and lower control limits respectively. The \(p\)-chart is useful when the sample size varies.

    On the contrary, an np-Chart utilises the actual count of defectives in a group (\(np\)), ensuring it's more suitable when the sample size remains constant. In the np-chart, the control limits are calculated using:

    \[ UCL = np + 3 \sqrt{np(1-p)} \] \[ LCL = np - 3 \sqrt{np(1-p)} \]

    It’s worth noting that both p-Chart and np-Chart fall under the category of Shewhart control charts, named after Walter A. Shewhart, the father of statistical quality control.

    Constructing attribute control charts involves several stages, starting with collection of appropriate data, calculating proportions for p-charts (or numbers for np-charts), computing the control limits, and finally drawing the chart. Modern statistical software packages facilitate this process, streamlining the task of chart creation and interpretation.

    Real-life Attribute-Based Control Chart Examples

    Example 1: A manufacturing company producing LED bulbs needs to maintain high product quality. The quality control team could adopt a p-chart to monitor the proportion of defective LED bulbs in a daily sample of size 500. Any unusual patterns or out-of-control points on the p-chart would prompt an investigation into the manufacturing process.

    Example 2: A contact centre is keen on ensuring superior customer service, and thus, wants to minimize the number of complaints. Here, an np-chart would be apt to monitor the number of complaint calls received each day (assuming the total number of calls remains steady). Through this, the firm can spot any substantial changes and swiftly address the potential issues leading to customer dissatisfaction.

    These examples illustrate the impactful application of attribute control charts in enhancing production and service operation quality.

    Deriving the Control Chart Formula

    Understanding the mathematical backbone of control charts is crucial in engineering process control. The formulae used in creating control charts lay the foundation for quality control, optimising processes, and making informed managerial decisions. To derive these equations, we turn to probability theory and statistical rules.

    Exploring the Mathematical Formulae Behind Control Charts

    The construction of control charts involves important mathematical formulae based on statistical principles. One of the main equations underpinning control charts is the one used to calculate the process average or mean. This is defined as:

    \[ \mu = \frac{1}{n}\sum_{i=1}^{n} x_i \]

    Where \( \mu \) is the process average or mean, \( n \) is the number of data points, and \( x_i \) represents each individual data point.

    Then, it's essential to calculate the control limits, which indicate the expected deviation of data points. The upper and lower control limits (UCL and LCL) are calculated as follows:

    \[ UCL = \mu + z\frac{\sigma}{\sqrt{n}} \] \[ LCL = \mu - z\frac{\sigma}{\sqrt{n}} \]

    Where \( z \) is the standard score or z-score, representing the number of standard deviations a data point is from the mean. \( \sigma \) is the standard deviation, a measure of the amount of variation or dispersion in the dataset.

    These equations provide the backbone for the Shewhart control charts. But, it should be noted that different types of control charts use different static rules and require additional specific formulae. For example, in an attributes control chart, the calculation of control limits involves binomial or Poisson distributions.

    Practical Examples Using the Control Chart Formula

    Let's illustrate the application of the control chart formulae with two examples.

    Example 1: A packaging company wants to ensure its packages weigh, on average, 500 grams, with a standard deviation of 2 grams. The company samples 30 packages every hour. Using the formulae for control limits, the upper and lower control limits for an X-Bar Chart would be:

    $UCL = 500 + z\frac{2}{\sqrt{30}}$ and $LCL = 500 - z\frac{2}{\sqrt{30}}$ if we use a z-score of 3 (which corresponds to 3 standard deviations), the UCL would be approximately 501.1 grams and the LCL would be about 498.9 grams. If any sample mean falls outside these limits, the packaging process may need adjustment.

    Example 2: A call centre analyses the proportion of calls solved at first contact. They record whether each of 500 daily calls was resolved in this way. Here a p-chart would be useful. If from historical data, we know that about 90% of calls are typically resolved at the first contact, our control limits would be:

    $UCL = 0.9 + 3 \sqrt{\frac{0.9(1-0.9)}{500}}$ and $LCL = 0.9 - 3 \sqrt{\frac{0.9(1-0.9)}{500}}$. Thus, the UCL would be about 0.942, and the LCL about 0.858.

    Control Chart Quality: An Essential Measure

    In the realm of engineering and quality control, the quality of a control chart itself is an essential measure. It doesn't just refer to the precision with which computations are performed but also to the adequacy of the control chart in reflecting the true nature of the process variation.

    Control Chart Quality: An Essential Measure

    When discussing the quality of control charts, two primary aspects should be considered. Firstly, the accuracy of the calculations involved in creating the control chart, ensuring the chart accurately reflects the data it is presenting. Secondly, the appropriateness of the control chart for monitoring the specific process. Different processes require different types of control charts, contingent on the nature of the data and the specifics of the process.

    A high-quality control chart should:

    • Include clearly labelled axes and a title
    • Show the data points, mean, and control limits
    • Be based on reliable, accurate data
    • Be updated regularly with fresh data

    Remember, the focus is not simply on the finished chart but also on the ongoing process of updating and interpreting it. Regularly adding data and interpreting the chart correctly is as important as the initial setup. A well-maintained control chart will display both common-cause variation (inherent to the process) and special-cause variation (due to specific events), thereby providing useful insights for managing and improving the process.

    The Role of Control Chart Quality in Engineered Processes

    The quality of a control chart plays a critical part in engineered processes. It allows those managing the processes to identify variations and understand their potential causes. If a control chart is of poor quality - due to inaccurate computations, inappropriate chart choice, or misinterpretations - it can lead to incorrect diagnoses and misguided interventions.

    What distinguishes control charts is not the specific rules used to detect "out of control" conditions. Instead, it's the philosophy behind their use. Control charts are part of a feedback process, aiming to provide a scientific basis for concluding when a change is significant - that it's highly unlikely to have occurred purely due to random, common-cause variation.

    In conclusion, investing time and effort to ensure high control chart quality reaps dividends by supporting accurate diagnoses and efficient, effective process improvements.

    Control Chart - Key takeaways

    • Control charts are statistical tools used to monitor and improve the reliability and predictability of process output. They're used in various sectors like manufacturing, engineering, IT, healthcare, and logistics.
    • The chart is created by first determining the average or mean of the data set, then calculating the standard deviation.
    • There are two primary categories of control charts: charts for process location, which detect shifts in the process level, and charts for process variation, which detect changes in the process variability.
    • Control charts for attributes are used to monitor the characteristics of a process, particularly in qualitative attributes such as pass/fail, go/no go, or defective/non-defective. They include p-charts, which monitor the proportion of defective items, and np-charts, which monitor the number of defective items.
    • All these types of control charts use specific formulas to calculate the process average or mean and the upper and lower control limits. They help maintain quality, optimize processes, and assist in decision making in process control.
    Control Chart Control Chart
    Learn with 15 Control Chart flashcards in the free StudySmarter app
    Sign up with Email

    Already have an account? Log in

    Frequently Asked Questions about Control Chart
    What is a control chart?
    A control chart is a statistical tool used in quality control to monitor and control process variation. It charts data over time, helping to identify unusual events or trends that could indicate an issue with the process.
    How can a control chart be created?
    To create a control chart, first collect data and calculate the average. Next, determine the range and calculate control limits. Plot the data points, average line and control limits on a chart. Finally, analyse it for variations or trends that exceed the control limits.
    What is a control chart used for?
    A control chart is used in engineering for monitoring, controlling and improving a process over time. It helps to identify any variations in the process that may affect the quality of the output.
    How can one interpret a control chart?
    A control chart is interpreted by observing where the data points fall in relation to the control limits. If the points are within the limits and show a random pattern, the process is stable. If the data points exceed the limits or display a non-random pattern, it indicates a need for process adjustment.
    What is a control chart in quality control?
    A control chart is a graphical tool used in quality control to track process variability over time. It helps determine if a process is in a state of statistical control, identifies issues, and assesses the effectiveness of changes in process control activities.
    Save Article

    Test your knowledge with multiple choice flashcards

    What is the primary purpose of control charts in process management?

    What are the p-Chart and np-Chart used for in quality control?

    What is the focus of control charts for process location and outline an example of their use?

    Next

    Discover learning materials with the free StudySmarter app

    Sign up for free
    1
    About StudySmarter

    StudySmarter is a globally recognized educational technology company, offering a holistic learning platform designed for students of all ages and educational levels. Our platform provides learning support for a wide range of subjects, including STEM, Social Sciences, and Languages and also helps students to successfully master various tests and exams worldwide, such as GCSE, A Level, SAT, ACT, Abitur, and more. We offer an extensive library of learning materials, including interactive flashcards, comprehensive textbook solutions, and detailed explanations. The cutting-edge technology and tools we provide help students create their own learning materials. StudySmarter’s content is not only expert-verified but also regularly updated to ensure accuracy and relevance.

    Learn more
    StudySmarter Editorial Team

    Team Engineering Teachers

    • 18 minutes reading time
    • Checked by StudySmarter Editorial Team
    Save Explanation Save Explanation

    Study anywhere. Anytime.Across all devices.

    Sign-up for free

    Sign up to highlight and take notes. It’s 100% free.

    Join over 22 million students in learning with our StudySmarter App

    The first learning app that truly has everything you need to ace your exams in one place

    • Flashcards & Quizzes
    • AI Study Assistant
    • Study Planner
    • Mock-Exams
    • Smart Note-Taking
    Join over 22 million students in learning with our StudySmarter App
    Sign up with Email